Every site manager has seen it: a wall finished, a ceiling closed, a slab poured β and then broken out because something was wrong. Rework costs money, time and morale, and most of it is avoidable.
A survey of more than 3,900 industry leaders by FMI and Autodesk estimated US$88.7 billion of rework in 2020 linked to bad project data alone β about US$7.1 million a year for a contractor with US$1 billion in revenue. Read the FMI summary
AI-assisted coordination of drawings and BIM models finds conflicts while they are still lines on a screen. On a US life-sciences renovation, Timberline Construction and OAR resolved 350 clashes before any trade reached the field, avoiding about US$45,000 in rework and chargebacks. Read the project
360Β° photo walks or scans are compared with the model to spot deviations right after installation. German contractor MBN identified 38 relevant errors on a residential project this way; one misplaced drywall caught immediately saved about β¬7,000. Read the case study
A Hong Kong contractor used continuous LiDAR scanning to catch excavation deviations before follow-on trades started, reporting a 60% reduction in rework and over 3,200 survey hours saved. Read the case study
AI assistants can log, price and route every change for approval, so nobody builds the old version. This is low-tech to start and often the fastest win.
These are published third-party results, not smert.ai projects. smert.ai is not affiliated with the companies named.
AI flags issues; engineers decide. No tool replaces certified engineering sign-off.